Saturday, July 17, 2010

House Remodeling

Right front side of the house with siding. This is the Kitchen bump out..

Front of the house with new front door installed, it will be dark stained.





Still have to put the new porch flooring in, and the ceiling in the new area



The new well house ready for siding, and roofing




View from Upstairs Middle Dormer Window




Left side bedroom-this is the closet across the backside-window is on the right-bathroom on the left- and dormer would be beind the person that took the photo.


Upstairs Bathroom. It will have a double vanity and then pocket doors that go into the tub/toilet area.



Upstairs Bedroom to the right when coming up the stairs-Dormer behind the person taking the photo, door to the right, window on the left



Dormer Window for upstairs right bedroom



Half Upstairs/Half Downstairs taken from the steps and looking to the left




Downstairs master Bath/Closet area







Downstairs Bathroom



Kitchen


Kitchen

Fireplace and Den


Fireplace


Electrical Panel In Sewing/Laundry Room


We we are approximatley six months into the remodel, and hopefully back in the hose within another couple months. Sheetrock, last electrical, beams in the kitchen, flooring, tile, trim, cabinets, counter tops, lighting, painting inside and out, asphalt driveway, and stone work has to be done...and we are getting to the end of the budget. We may have to wait on stone work and asphalt to the new carport. We added a lot of things we were not going to add as we were remodelin such as going ahead and finishing the upstairs, the side porch, and the garage part. We had talked about waiting on all of those parts, but I am so glad now that we did not.

1 comment:

D. said...

The remodeling is coming along really nice...I know you will be glad to get back in and get settled. Hopefully you will have it just like you want it before the new baby arrives.